Projects

Docking of ferries without losing energy >

TEB Engineering has developed a system which is safe to use even in windy conditions, whilst the main propellers can be running idle.

 

 

Updating of control system >

An out-of-date IC2000 / Mitsubishi control system has been replaced by a modern WinCC / S7-300 system.

   

 

Connecting old and new control systems >

TEB Automation has created a gateway between an all-new Allen-Bradley control system (Logix5000) and the existing old control layer.

 

 

Fast and flexible product handling >
After separating, all products are checked by a vision system which signals the robots to pick up all approved products.  
 

 

Logistic problems? >
Barcode printers and scanners make sure that all products can be traced after production.    

 

1-5 of 12 Next Page